Preparing 40 kg of solder for THT assembly on the semi-automatic machine. The melting process took place at a temperature… — first video frameEvents

THT assembly: preparing solder for the semi-automatic machine

Preparing 40 kg of solder for THT assembly on the semi-automatic machine. The melting process took place at a temperature of around 240 degrees Celsius.

In 2020, ELETOR made a number of investments aimed at speeding up production…Products

Short-run production: ELETOR investments in 2020

In 2020, ELETOR made a number of investments aimed at speeding up the production of short-run products and prototypes. One stage of the production cycle is THT assembly of through-hole components. To this end, a machine was purchased, replacing…

Controller for an agricultural produce storage facilityProducts

Controller for an agricultural produce storage facility

ELETOR has completed implementation work on a new control device project. The new controller is designed to monitor climate conditions in agricultural produce storage facilities. The device is currently being tested in its intended environment. Feedback is being gathered from the end customer…

INSOURCING AT ELETOR — first frame of the videoEvents

Insourcing at ELETOR

Before the Covid-19 pandemic, ELETOR’s organisational structure included key departments essential to the company’s existence and development, such as the design office, sales department and finance department. Most production processes had been outsourced under outsourcing contracts. The new…

The sounds of the SMT assembly machine break the stillness of the night. Today, after two months… — first frame of the videoEvents

Pick and place machine: first SMT tests at ELETOR

The sounds of the SMT assembly machine break the stillness of the night. Today, after two months of waiting, the P&P machine arrived. Night-time testing is under way.

Eletor CA-5 GSM alarm control panelProducts

Testing a new alarm control panel with a GSM notification module

Today, 22/09/2020, we are testing a new design of an alarm control panel with a proprietary GSM notification module at our facility. In addition to the electronics, a mounting system for the electronic unit, battery and power supply has been designed to ensure optimum device performance while…

NEW PROJECT: ALARM CONTROL PANEL WITH GSM MODULEProducts

New project: alarm control panel with GSM module

Today at our facility, we are testing a new alarm control panel project with an in-house GSM notification module. In addition to the electronic components, a mounting system has been designed for the electronic unit, battery and power supply to ensure the device works optimally while remaining easy…

New work tools need to be optimised to meet individual needs. Fridays at our factory are…Events

THT assembly: temperature testing in the production process

New work tools need to be optimised to meet individual needs. Fridays at our factory are a taste of the weekend. An ideal day for testing and production improvements. Today we tested the best temperature settings for assembling SMT components in the new soldering oven.

The September issue of the monthly magazine "Trzoda Chlewna" attempted to analyse the solutions available for…Products

Livestock farming automation: ELETOR in Trzoda Chlewna magazine

The September issue of the monthly magazine "Trzoda Chlewna" attempted to analyse the solutions available in Poland for automating livestock farming systems. ELETOR was invited to provide advice in this area. We shared some of our latest solutions for computer-based…

ELETOR graphic: air monitoring system for herb-drying roomsProducts

Air monitoring system for herb-drying rooms

During the summer this year, ELETOR developed a project for an air monitoring system in herb-drying rooms. The system was based on the Speed Control 12 controller, with the software modified to meet the client's specific requirements. The main parameters monitored were…

NEW SC-S CONTROLLERS AT FULL POWER 6A — first frame of the videoProducts

New SC-S controllers at full power 6a

Yesterday, we received a new version of the SC-S controller from the assembly plant. Our flagship product, used on hundreds of pig farms, will be able to control two fans with a diameter of 630 mm from the latest production series. This was achieved through changes to the output stage…

Holiday or not, we’re staying in touch with you. We may be a little slower than usual, but we’ll reply to everyone’s…Events

Back from holiday: contact with ELETOR in 2020

Holiday or not, we’re staying in touch with you. We may be a little slower than usual, but we’ll reply to everyone’s messages. Thank you for keeping in touch with us by email. From Monday, we’ll be back at work at full speed.

Ambulance battery monitoring system BM-4UIProducts

BM-4UI: battery monitoring in ambulances

Key features of the BM-4UI battery monitoring system in medical ambulances – measurements performed on 1 to 4 separate batteries, depending on the ambulance version – clear display of measurements on the OLED screen – current measurement parameters – shunt range and size…

Today, ELETOR received its first order for its own current monitoring system for emergency…Events

Current monitoring in ambulances: first order

Today, ELETOR received its first order for its own current monitoring system for emergency vehicles. The system was tested by the client over the past few weeks. The order confirms that the system is working properly and will now…

Yesterday, 23/07/2020, an international online seminar was held, moderated by a representative…Events

Seminar on business cooperation with Dubai

Yesterday, 23/07/2020, an international online seminar was held, moderated by a representative of Sharjah Research, Technology and Innovation Park in Dubai. The main topic was new opportunities for Polish companies to operate in the United Arab Emirates and the MENA region. D…

ELETOR graphic announcing the August 2020 holidayEvents

Summer holiday 2020

Dear Sir or Madam, we would like to inform you that this year our company’s summer holiday is planned for 1 to 15 August. As is traditional, the whole team will be away. As a result, ELETOR will be closed on these days. During the holiday, we will suspend order processing and…

Eletor in the GaszynChallenge campaignEvents

ELETOR in the #gaszynchallenge charity campaign

On 7 July 2020, ELETOR was nominated by ŻAK Zbiczno Football Club to take part in the nationwide gaszynchallenge charity campaign. The ELETOR team, of course, accepted the challenge and completed it on 10 July 2020. To keep the good going, we invited…

As part of its supporting activities, ELETOR also carries out bespoke projects. In the photo…Events

Current monitoring in ambulances: ELETOR project

As part of its supporting activities, ELETOR also carries out bespoke projects. The photo shows our own current-monitoring system for emergency ambulances. The system is adapted for use in ambulances around the world.

The June issue of the magazine "Trzoda Chlewna" featured an article on ventilation in its Technology section…Products

Ventilation in pig housing: ELETOR equipment

The June issue of the magazine "Trzoda Chlewna" featured an article on ventilation in livestock buildings in its Technology section. The recommended solutions also included equipment from our ELETOR brand. We are pleased that our many years of work have been recognised and…

Free copies of the latest issue of the magazine "Trzoda…Events

Trzoda Chlewna: ventilation control materials

Free copies of the latest issue of the magazine "Trzoda Chlewna" are available in our showroom. Please come and collect one. We particularly recommend Mr Leopold Tupalski's article "Control in ventilation systems".

Eletor SC-12Products

SC-12 controller available from June 2020

Dear Sir or Madam, due to a significant increase in demand for our electronic devices for livestock farming, we would like to inform you that we have sold out the entire stock of SC-12 climate controllers planned for the first half of 2020. We are currently waiting for component deliveries…